The Norman Rockwell Museum project

Posted on Posted in In Progress

The Norman Rockwell Museum project was finished the week of June 12th with final tasks completed including:

  • Final subbase for the HC access route
  • Walkway asphalt subbase installation
  • Final walkway asphalt surfaces installation
  • Museum exterior minor repairs and painting
  • Sodding most disturbed areas
  • Reset directional signage


All construction by Broadwell Construction LLC, Patrick Keating, Project Manager with their subcontractors:

Adams Trucking
Paving subbase, final grading, sod installation

Comalli Electric

W.E. Williams Paving Inc
Bill Williams, Owner

NRM site crew – Mark Carey and Ed Ziarnik, assisted with the sod installation and its watering.